![]() Quote:
Deciding to drill the tank after completing everything wasn't the most ideal thing and a lot of my plumbing just had to be modified and improvised to fit what I already had haha Tomorrow will be the final leak test so hope everything works *cross fingers* Quote:
![]()
__________________
Budget doesn't exist in this hobby: 45G Build Clam Specific IM Lagoon 25G Build -Brian |
#2
|
|||||
|
|||||
![]() Thank god it's the weekend! I think I'm finally nearing completion of the tank portion of the build.
Lots of work in the last couple days. Overflow and external box put into place with silicone on all the bulk heads and in every nook and cranny to avoid any leaks. Waiting for more things to dry, my favorite... ![]() ![]() With the use of many couplings, I was actually able to reuse all of the previous plumbing I had and minimize cost which was nice. One new line put in for the emergency line. ![]() Inside plumbing, really starting to get crowded down here. Can't imagine how crammed it's going to be after all the electrical components are installed too. ![]() Tomorrow will be leak testing and I'll be able to call the build done if nothing goes wrong!! ![]()
__________________
Budget doesn't exist in this hobby: 45G Build Clam Specific IM Lagoon 25G Build -Brian Last edited by Etaloche; 01-23-2016 at 06:17 AM. |