![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
#7
|
|||||
|
|||||
![]() Time to move back one step ... because the canopy was built after I had the plumbing done ... but it screwed up my sequence for the Journal.
So lets get to the plumbing. First the tank needed to be drilled. Plumbers putty and a bit of patience to the rescue: ![]() And thanks to trickery of photography ... I'm done ![]() ![]() After the holes were drilled I painted the back ... ![]() And then began construction on the Coast to Coast Overflow ![]() And voila! ![]() The pump is a Reeflo Dart (3600 GPH) ![]() ![]() ![]() And because I used the Beananimal overflow ... 3 standpipes ![]() There is also a 1" line that diverts from my 1.5" piping on the return that circulates back into the sump. This is for a filter sock. But because my overflow doesn't go to the sock, there is a 0% chance of an overflow because of a plugged filter sock. ![]() The return on the pump is diverted into 4 separate outlets of loc-line that have fan nozzles and locline ball valves. This gives me full control in terms of flow. If I have a piece that can't handle the high flow, I can turn down 1 of the ball valves decreasing the flow in one area and increasing it in another. ![]() ![]() |
Thread Tools | |
Display Modes | |
|
|