![]() |
|
|
|
#1
|
|||||
|
|||||
|
__________________
Doug |
|
#2
|
|||||
|
|||||
![]() ![]() Overflows done & drying. Some idiot forgot to tape the front right one. Oh well, won't be seen once covered. As the stones sand, "paint it black", as on my back glass. The 6 in. where overflows are will be hidden. And piping will go through visible hole to my office/fishroom.
__________________
Doug Last edited by Doug; 06-05-2015 at 09:12 PM. |