![]() |
|
#1
|
|||||
|
|||||
![]() Quote:
Oh, checked their site Hours: Mon - Fri: 11:00 - 8:00 PT Saturday: 11:00 - 6:00 PT Sunday: Noon - 5:00 PT Holidays: Noon - 5:00 PT Open tomorrow ![]()
__________________
Brad |
#2
|
|||||
|
|||||
![]() Quote:
![]() |
#3
|
|||||
|
|||||
![]() That would work..
__________________
Brad |
#4
|
|||||
|
|||||
![]() Quote:
![]() |
#5
|
|||||
|
|||||
![]() Don't mind me. I'm the impatient type. I had rocks and water in before the overflows were attached. And the whole tank was running across the room from where it was going. Had to drain and drag to get it in place
![]()
__________________
Brad |
#6
|
|||||
|
|||||
![]() Yeah... that totally wouldn't slide with my wife.
|
#7
|
|||||
|
|||||
![]() I'm lucky, my wife is almost as bad as me, and a lot more patient. She needs that around here lol
__________________
Brad |
#8
|
|||||
|
|||||
![]() Quote:
So I didn't think you'd tested as I don't see your plumbing completed yet Quote:
Oh wait, that's not true lately. NM |
#9
|
|||||
|
|||||
![]() Quote:
![]()
__________________
Brad |
#10
|
|||||
|
|||||
![]() So I broke down (I blame Brad and Greg) and went to J&L for the last few items. Installed the Apex PM2, and all the final plumbing bits.
Just waiting on J&L in regards to bringing in some substrate and Best Buy to deliver the WiFi module. Obviously those last two items are not needed to start the RO/DI, however the rockwork is. The centre brace is in the way of dropping the completed structure into the tank, so it needs to be built 'in tank'. I'd rather not do that underwater. Hung one of the Kessils just to see what it looked like. Dirty dirty glass. ![]() |