![]()  | 
	
| 
	 | 
| 
		 
			 
			#1  
			
			
			
			
			
		 
		
		
	 | 
|||||
		
		
  | 
|||||
| 
	
	
		
			
			 That's really nice.  I want to do shaker doors on my stand too.  Following along 
		
	
		
		
		
		
		
	
		
		
	
	
	Sent from my Nexus 4 using Tapatalk  | 
| 
		 
			 
			#2  
			
			
			
			
			
		 
		
		
	 | 
|||||
		
		
  | 
|||||
| 
	
	
		
			
			 | 
| 
		 
			 
			#3  
			
			
			
			
			
		 
		
		
	 | 
|||||
		
		
  | 
|||||
| 
	
	
		
			
			 Got 2 coats of white done yesterday. Pics look the same so I won't bore you guys with them. Headed to Nanaimo today to pick up plumbing supplies and other stuff for work.  
		
	
		
		
		
		
		
	
		
		
	
	
	Got a call from Jeff at LifeReef last night... my new skimmer is on it's way! Yay!  | 
| 
		 
			 
			#4  
			
			
			
			
			
		 
		
		
	 | 
|||||
		
		
  | 
|||||
| 
	
	
		
			
			 Looking great Dominique . 
		
	
		
		
		
		
			You better hurry up and get it done, with this weather you'll be back outside building the wife's garden fixtures. 
				__________________ 
		
		
		
		
	
		
		
	
	
	 
			 | 
| 
		 
			 
			#5  
			
			
			
			
			
		 
		
		
	 | 
|||||
		
		
  | 
|||||
| 
	
	
		
			
			 Lol, you have no idea how accurate that statement is  
		
	
		
		
		
		
		
	
		
		
	
	
	  She's already chomping at the bit for a few things to get done.I got a couple hours this aft to work on some of the plumbing. I had to fish all my lines up through the wall from the basement, so I opted to run that section in white spa flex. Only down side is how stiff this stuff is, but with a little grunt work I was able to get them all in. I'm planning running a Herbie set up, it's worked extremely well for me so far. Using Beananimal's flow guide, the numbers work for running a single 1" full siphon, but it seemed close, so I ran 2. This also gives me the ability to run Beananimals silent overflow should the desire hit me. I also ran a 1-1/2" safety overflow. The returns are probably overkill. I'm planning on running 2 Waveline 12,000's. The output's on them are 1-1/4" so I ran 2, 1-1/4" lines. One on the front of the tank and one at the back. My plan is to run a line across the front with 3 - 3/4" loc-lines and the same across the back, each on their own pump. After the first 3/4" loc-lines come off, I'm going to reduce to 1", then when the second comes off, reduce to the final 3/4" loc-line. Yesterday, while in Nanaimo I got most of the hardware I need for my cabinet doors although I've yet to order them. Hopefully that'll happen early next week. Any suggestions on doing something different/better, let me know. Anyway pics: Lots of pipes for such a small hole ![]() ![]() ![]()  | 
| 
		 
			 
			#6  
			
			
			
			
			
		 
		
		
	 | 
||||
		
		
  | 
||||
| 
	
	
		
			
			 Lookin' good, Dom! 
		
	
		
		
		
		
		
	
		
		
	
	
	One recommendation I have is to brace the spaflex to take stress off the bulkheads on the overflow box. Because the spaflex is pretty stiff and has a BRUTAL shape memory that tries to make it coil back up, it ends up putting constant stress on the bulkheads over time, especially in a tight space. I've already had one bulkhead fail because of it (the sideways torque caused the external plastic nut on the bulkhead to skip a thread and come loose - that was an exciting day). And now that I'm typing this I can see the back of the tank and am noticing a lot of salt creep on one of the bulkheads, telling me that it's not far off from a repeat. I think I'm going to replumb and use hard piping.  | 
| 
		 
			 
			#7  
			
			
			
			
			
		 
		
		
	 | 
|||||
		
		
  | 
|||||
| 
	
	
		
			
			 Wow beautiful set up so far.  Gonna follow along 
		
	
		
		
		
		
			
		
		
		
		
	
		
		
	
	
	![]()  |