![]() |
#11
|
|||||
|
|||||
![]() Finally got some scaping done with the new LR
First was a little mishap with some coral glue ![]() ![]() ![]() Here's the before shot of the scape ![]() And here's the after shot ![]() I removed 35lbs of base rock and added 25lbs of LR The scape is missing a piece between the right and middle towers ... We'll have to find something at the LFS Next is to add as much of the leftover LR to the sump and sell the leftovers ![]() Last edited by gregzz4; 06-07-2012 at 07:40 AM. |