![]() |
#1
|
|||||
|
|||||
![]() --------------------------------------------------------------------------------
In the planning stages of my next project which will include a redesign of my sump. I would like to simplify water change tasks and would like thoughts on what I have in mind before I get too far into the build. The sump will be for a 75gallon tank that will allow for ~5-6gal water changes roughly 6-8% of the water volume assuming that the water in the sump will even out the displacement of the rockwork in the display. I would like to keep the footprint within the standard 48” x 18” design, and incorporate an RO/DI reservoir and freshly mixed saltwater with circulation and heating. Here is what I’ve come up with so far: ![]() Assuming that there is saltwater already mixed I’ve put together a sequence of events that would complete the water change….the times and durations will need to be determined of course. 1. On – FSW circulation and heater (hours? in advance to prep for water change) 2. Open – Return pump drain valve 3. Close – Return pump drain valve 4. Off – FSW circulation and heater (prior to transfer) 5. On – Transfer Pump (Size?) 6. Off – Transfer Pump 7. Dispense salt mix prior to next scheduled water change The saltwater mixing tank will be filled the next time the RO/DI reservoir cycles, and level kept constant. The RO/DI will cycle every 3 gallons (too much?).
__________________
Sunil One day I'll be finished......then What? |