![]() |
|
#1
|
||||
|
||||
![]() I am pretty sure my floor joists are engineered floor joists because it looks like this http://www.icreatables.com/framing/w...or-joists.html
I double check in the basement, there is at least 1 joist below the tank. the tank is positioned from half the distance from load-bearing wall - 1st joist to half the distance from 1st joist to 2nd joist. So the first joist takes all the hit. |