Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > DIY

Reply
 
Thread Tools Display Modes
  #1  
Old 07-19-2011, 04:45 PM
sphelps's Avatar
sphelps sphelps is offline
Member
 
Join Date: May 2006
Location: Lyalta, East of Calgary
Posts: 4,777
sphelps is on a distinguished road
Default

Personally I would still suggest going 2" for the amount of weight. If you do use 1-1/2 then be sure it is actually HSS (structural steel, cold forged). If it's just hot rolled square tubing 1-1/2 is going to be pretty sketchy. As others have suggested extra columns is a good idea as well as adding angled supports at all corners to reduce the load on the joints and keep things square.
Reply With Quote
  #2  
Old 07-19-2011, 05:26 PM
jorjef's Avatar
jorjef jorjef is offline
Member
 
Join Date: Apr 2010
Location: Regina
Posts: 983
jorjef is on a distinguished road
Default

Quote:
Originally Posted by sphelps View Post
Personally I would still suggest going 2" for the amount of weight. If you do use 1-1/2 then be sure it is actually HSS (structural steel, cold forged). If it's just hot rolled square tubing 1-1/2 is going to be pretty sketchy. As others have suggested extra columns is a good idea as well as adding angled supports at all corners to reduce the load on the joints and keep things square.
Good point almost all tubing 1.5 or smaller isn't tested for yield and tensile with the exception Griz mentioned 188 wall. Personally I would worry more about the guy doing the fabricating. You could get the best materials but if the guy doing the work doesn't know what he's doing it could be a disaster
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 04:34 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.