![]() |
|
#1
|
||||
|
||||
![]() sound good. ive always liked the scwd for its alternating flow but without it the pvc work would be much easier. dont need the extra hard to flex union. i only run the mp10 at 75% anyway so maybe now i'll dial it up all the way.
the 1260 is powering a reactor as well so it doesn't all go upstairs. Thanks for the advice. |