![]() |
|
#1
|
|||||
|
|||||
![]() Craig and Nora found me a new toy today!!!
![]() ![]() ![]() |
#2
|
|||||
|
|||||
![]() got no pictures yet but the stand and side cabinet are done minus hanging the doors. I'm hoping to get into the breakers tomorrow to run my 2 new 15amp circiuts to the tank. Then Friday night/Saturdat will be finishing off the canopy and tying it into everything else.
Biggest problem ahead is what color to paint everything!!! |
#3
|
|||||
|
|||||
![]() got some new toys, some lights, fans, base rock.
![]() started drilling and stacking rocks last night made it about halfway before calling it a night. Its hard to tell in the pics but these are fairly large pieces!! ![]() ![]() ![]() |
#4
|
|||||
|
|||||
![]() got the stand and side cabinet painted and the electrical ran from the breaker into it, just need to wire the gfi's. Mind the mess!!
![]() Here's the top shelf of the side cabinet, It houses the 4 MH ballasts and the 2 T5 ballasts. ![]() This ones still abit messy till i get the plug in's all wired. But in the end this will be the junction box for everything electrical ![]() |
#5
|
|||||
|
|||||
![]() This is the moonlighting running, 12 leds
![]() this is the antinics, 4-4ft t5 ho's ![]() Its hard to get a good fts with the halides on, they tend to get a glare from every angle i try!! ![]() |
#6
|
|||||
|
|||||
![]() here's the finish product of 2 weeks woodworking!! Granted a pro could've been done quicker!!lol
![]() ![]() |
#7
|
|||||
|
|||||
![]() So.. I finally got my frag tank transfered over to the sump of the new tank. Took awhile but everything got a quick dip just for kicks and moved on over!!
![]() |