Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Tank Journal

Reply
 
Thread Tools Display Modes
  #1  
Old 11-05-2010, 02:16 AM
Skimmerking's Avatar
Skimmerking Skimmerking is offline
acanthastrea freak
 
Join Date: Jun 2002
Location: Virden, Manitoba
Posts: 5,690
Skimmerking is on a distinguished road
Send a message via ICQ to Skimmerking Send a message via MSN to Skimmerking
Default

Well that deserves a BIG ROGER on the skimmer buds.
__________________
180 starfire front, LPS, millipora
Doesn't matter how much you have been reading until you take the plunge.
You don't know as much as you think.
Reply With Quote
  #2  
Old 11-23-2010, 04:18 AM
bioload's Avatar
bioload bioload is offline
Member
 
Join Date: Aug 2009
Location: Toronto
Posts: 129
bioload is on a distinguished road
Default

Between work and the family I got some time make some progress on the fixture. The LED's are mounted to the heat sinks in the standard alternating blue/white pattern. The assembly was fairly simple with the screws provided in the kit. All I needed to do was apply some of the thermal grease and screw into place. A word of caution regarding the grease.....a little goes a LONG way.



Some planning is required in order to position the LED's in order to connect them in series. I also found that the wires that came in the kit were too short for the layout that I have. They are okay if I were to connect the LED's side by side, but came up quite a bit short running diagonally.
__________________
Sunil

One day I'll be finished......then What?
Reply With Quote
  #3  
Old 11-24-2010, 03:12 AM
bioload's Avatar
bioload bioload is offline
Member
 
Join Date: Aug 2009
Location: Toronto
Posts: 129
bioload is on a distinguished road
Default

The acrylic box I'm building will be home to two of the segments with one box for each side of the 75 gallon. The dimensions are approximately 22"w, 13"d, and 2.5"high. I might drop the height down to 1.5" if I decide to go without the optics.

Below are the pieces that were cut for the font, back, and sides. The two sides will be router prep'd in order to bond with the front and back.

__________________
Sunil

One day I'll be finished......then What?
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 11:05 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.