![]() |
|
#1
|
|||||
|
|||||
![]() Some progress. Here are the two aluminum angles mounted in the fixture:
![]() And then I lay the three heatsinks on top to figure out spacing and where to drill my mounting holes: ![]() Now because of the shape of the housing the aluminum angle had to be mounted pretty much flush with the bottom of the housing but I need clearance for the LEDs and optics so the heatsinks have to be raised a bit. So I cut some nylon spacers to place between the heatsinks and the angle. ![]() And here it is all assembled: ![]() So now that the mechanical engineering part is more or less sorted its on to the electrical engineering ![]() |
#2
|
|||||
|
|||||
![]() what are the milled squars for? is that the bottom or the top?
Steve
__________________
![]() Some strive to be perfect.... I just strive. |
#3
|
|||||
|
|||||
![]() The heatsinks came like that. Probably held some components or something. They are only 1/16 of an inch deep so a few emitters will sit 1/16 inch higher than the rest. I figured 1/16 inch won't make an appreciable difference in PAR and coverage etc. and given the cost savings of the heatsinks vs. something pristine I could live with it. It won't be visible inside the housing anyhow.
|
#4
|
|||||
|
|||||
![]() Heatsinks cleaned and polished a bit and 80 emitters mounted:
![]() next up, wiring... |
#5
|
||||
|
||||
![]() tagging along..
looking good so far! |