![]() Too bad...we could have used some extra help. As is, it got in. Neither the tank, nor any person, was injured in the process....so that's about as good as could be hoped.
This installation began the planning stages in October, 2005 as the house was being built. (No, I wasn't able to make much mod to the construction to accommodate the plan). Tank room construction began in late May, 2006. Basically...it's 75% done structurally; 90% done electrically; 0% done on plumbing...and 0% done on lighting. LOOONG way to go... |
#2
|
|||||
|
|||||
![]() The tank looks great and the room he had built looks good also.
Has lots of "boxes of bits" just waiting to be assembled. ![]() Can't wait to see it all together. If we ask nice maybe we can see some pics from the move. And thanks for the ones you sent me, they look great.