![]() |
|
#1
|
|||||
|
|||||
![]() Quote:
![]() ok...the I's have it I will run the fuge off just after the pump..... ![]() 1 inch all the way around ![]() ![]() So.....what your saying is that the return loc-line on top of the tank should stay 3/4 with a 1in pipe behind it ? Im thinking about adding a closed loop (at maybe 300-400GPH) to the tank I could use a J tube out of 1in and hook over the tank then add 1 more bulkhead on the back of the tank (since I'm drilling 2 anyway) or even another for the clossed loop intake....AAAAAAAAHHHHHHHHHHH STOP......BRAIN OVERLOAD.... ![]() To drill my tank I will be droping the water level down to aprox. half....then do the work....hope to set up another tank for the occupants I hope to borrow this tank for a few days......... MY WIFE IS GOING TO GO APESH** ON MY A**....... ![]() Thanks guys
__________________
Richard _______________________________________ My wife believed me when I told her it was only going to cost about $500.00. that was over two years ago and I'm still grounded..... ![]() |