Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > Other > Lounge

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #29  
Old 02-08-2012, 08:42 PM
toxic111 toxic111 is offline
Member
 
Join Date: Mar 2008
Location: Lloydminster, SK
Posts: 237
toxic111 is on a distinguished road
Default

Quote:
Originally Posted by Coleus View Post
got any good contact for me? So to break it down, here is what i need?


1) framing + dry wall guy

2) plumber

3) electrician

4) muding / taping

5) painting

6) flooring guy

Does this sounds right?
Need a finisher (trims, hanging doors)

& that would just about cover it.

24K without flooring is probably very close if you get someone to take care of everything. You might be 5K less if you act as your own general contractor.

I did my entire basement myself for under 15K (closer to 10K I think, never added the $$ up) It took me 3 years to do though. But my bacground is construction/design, the only thing I didn't do myself is electrcial (friend is an journyman) & the drywall. Oh, carpet in 2 bedrooms & floor tile in the bathroom was hired out. I did everything else, including a tiled shower.

Being your own general contractor is not that difficult, but you will need some time to follow up on subs.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 03:12 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.