![]() |
#29
|
||||
|
||||
![]() Time for an update..
Once again I am doing everything out of order, but that is ok. My thread, my rules. ![]() I had time to set up my lights and build a new canopy. I took some pics and put them in a folder and that is when I found the pics that show the wall being ripped out and being rebuilt so the GF could have a saltwater tank again. I started this on a friday night and had it mudded and taped by Sunday This wall divided the front entrance and living room. Pic shows the drywall removed ![]() Looking at the front entrance, from the living room. ![]() and looking from the kitchen..... ![]() Cut down the bearing wall studs.... ![]() Added a 3 1/2" x 9 1/2" x 14' Microlam to carry the load ![]() Then I ripped out the old tiles and flooring, cut down the studs to proper elevation and then put the top plate on.... ![]() I can not find the the other pics showing the framing out of another wall to make the top 28" wide, but this gives the idea.... ![]() Another view...This one showing the laminate flooring installed as well. I used 6x6 for the posts and header, then sheathed with 1" plywood. ![]() I do not have pictures, but I tiled the entire top as well. |