Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > DIY

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 02-03-2012, 10:59 AM
gregzz4's Avatar
gregzz4 gregzz4 is offline
On Hiatus
 
Join Date: Oct 2011
Location: Burnaby, B.C.
Posts: 4,890
gregzz4 will become famous soon enough
Default 2 part epoxy questions

Not knowing whether I should pose this here or in the Tips and Tricks section, but here I go ...
I have South Seas Base Rock. It's dry and clean. I drilled it and stuffed acrylic rods into some holes, but didn't like the stability, so I then bought some 2 part putty.
I soaked the rocks in water, applied the putty, and let it cure for more than the 4-6 hours recommended @ the required temperature. Everything seems to be solid, but now I have a potential issue ...

Do I have to keep it wet, now that I have stuck it together?
If so, looks like I'll have to buy yet another rubbermaid or 2.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 11:25 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.