Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Reef

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #16  
Old 10-31-2010, 09:01 AM
hillegom hillegom is offline
Member
 
Join Date: Nov 2008
Location: Surrey
Posts: 1,998
hillegom is on a distinguished road
Default

Quote:
Originally Posted by paddyob View Post
It is not moving enough to break the weld I am sure.... it just kinda "shimmies". I don't really know how to descibe.... it's enough to notice the movement. But thinking about structural work... a lot of it is bolted connections.... even bridge work is bolted connections so I am "hoping" I can do the same. My only real concern was the drilling of holes with the weight on top.... wondering if it would buckle.
I thought of something else then. If you cut triangles from 1/16 or 1/8 steel, then you could drill through the HSS horizontally and attach the triangles aginst the HSS instead of underneath. At each corner. It would increase the horizontal width of the stand. If you understand this your good. Hard for me to describe with words.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 07:56 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.