Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Tank Journal

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #16  
Old 02-23-2010, 08:16 PM
Delphinus's Avatar
Delphinus Delphinus is offline
Member
 
Join Date: Dec 2001
Location: Calgary
Posts: 12,896
Delphinus has a spectacular aura aboutDelphinus has a spectacular aura aboutDelphinus has a spectacular aura about
Send a message via MSN to Delphinus
Default

I don't really mind the electrical not passing. Even though part of it not passing was simply my misinterpretation of what constituted "ready" and part of it was "Ok I have to redo some of it", the list is not that bad, won't take me more than a couple days and after that it will all be to code.

What irks me is the plumbing. I plan to put a bathroom downstairs eventually but finances being a problem these days, my plan was to sit on it until well into the future. But since taking time off work to go to city hall and all that is a hassle, I decided to get the permit now and be done with it. I *thought* all I needed to show for the plumbing to get passed was just a "rough in" - roughly, the water comes from here..and roughly the water drains into that pipe there. The bathroom has a toilet and sink rough-in already but only one capped-off T. I was just going to T into this stem for the bathroom sink and mini-kitchen sink that sits on the other side. But it turns out that this isn't good enough, I need to rough-in BOTH T's for the sinks. Ok, no big deal there either: a hacksaw and $10 worth of ABS and ABS cement and I'm done.

The tank room sink is what really has me choked. Never in a 100 years did I anticipate I was going to be failed based on a laundry sink that I use to rinse a protein skimmer with because it drains into an existing floor drain. What has me doubly-choked on the whole thing is that when I built the house, I ASKED FOR A SINK ROUGH-IN. Between my cost-sensitive spouse and a housebuilder's sales lady who was doing her best to keep our build costs under control, I was out numbered and this option was struck from the list "because the floor drain is good enough." So the cost for saving $100, 6 years ago, is now today I have to foot probably about $1000 bill to have this work done. Even if I were to do it myself it will be HUGE pain to route a vent through the ceiling trying to work around HRV and furnace vents and who-knows-what just to tie it into the nearest pipe stem that's vented all the way up to the roof.

I'm just incredulous when I think of it. I thought it would all be about how the lines tie in and any issues with pipes pressing up against nails or whatever that could cause a leak. In the end, he couldn't have cared less about the supply lines. That part of the inspection was done in less than a minute and it was all fine. It was the drainage that he was all incredibly anal about and really the inspection was done in 2 minutes because he just ended it when I told him the tank room sink was draining into the floor drain. He was in and out in less than 5 minutes. And I had to take a day off work and sit at home and wait for 8 hours for that 5 minutes that ended so rather dissatisfactorily. I am NOT HAPPY.

I am giving serious consideration to "officially" removing the laundry sink from the plans.

With the electrical - everything - I understand there's a safety issue. After consideration, I fail to see the safety issue of a laundry sink that drains into a floor drain. Is the concern that the pipe could get kicked loose and water drains onto the floor? Is that any worse than tripping while carrying a bucket full of water?

I don't know. It's not the sort of thing I dare to say "I told you so" to my wife but at the same time I'm really annoyed with myself that I didn't stick to my guns back then.
__________________
-- Tony
My next hobby will be flooding my basement while repeatedly banging my head against a brick wall and tearing up $100 bills. Whee!

Last edited by Delphinus; 02-23-2010 at 08:34 PM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 09:34 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.