![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
#17
|
|||||
|
|||||
![]() Got a bit of time to work on the room over the weekend. Finished cleaning it all out and prepped for framing.
![]() ![]() ![]() The floor is not all that smooth or level, but my ceiling height is only 6' 2" or so, so I won't be levelling it any. I do have a bunch of tile left over from another job, so I may end up tiling it, but that's it. And I got almost all my walls framed up. I still have to fir out the wall where the SW and FW tanks will sit, then run all my plumbing, wiring, insulation and vapour barrier. ![]() ![]() ![]() |
Thread Tools | |
Display Modes | |
|
|