Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Reef

Reply
 
Thread Tools Display Modes
  #11  
Old 06-05-2012, 01:33 PM
mikeclarke mikeclarke is offline
Member
 
Join Date: Mar 2012
Location: Fernie, BC
Posts: 107
mikeclarke is on a distinguished road
Default

A couple of years ago our condo association made us get a structural engineer in to get our deck beefed up so we could hold the hot tub. The hot tub itself weighs very little (google softub) but holds 6 people and 300 gallons of water.

We had to double up every other joist, and install joist hangers to the ledger board. I think it was about a 10 foot span and we had to add two 2x12s to the beam (gluded with PL premium). The beam then had to be zig zagged with carriage bolts. We also had to add blocking in between each joist so that the joists would not twist.

I would say that you need to add another beam with 6x6s supporting it. I would have the 6x6s 4 feet down (or at least the pilings for the saddles down 4 feet).

Good luck
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 11:56 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.