Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Tank Journal

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 11-16-2014, 05:26 AM
WarDog's Avatar
WarDog WarDog is offline
Darth Moderator
 
Join Date: Mar 2013
Location: Maple Ridge, BC
Posts: 3,111
WarDog will become famous soon enough
Default

Leak test passed with flying colours. Bulkheads good, PVC glue good, unions good, floor and stand survived.
Took about half an hour to get the Herbie dialed in. Stupid quiet. Plugged in the heater and will probably add some vinegar once it heats up.



Here is the power failure test, water level only rises about 3 inches.



One slight problem. The vibration from the Eheim compact+ 5000 is transferring to the stand through the plumbing and is being amplified.
The wife pretty much told me to fix it or move out, lol.
The clear tubing off the return is only 5 and a 1/4" long before joining the PVC and I think is too rigid.
The pump has suction cup feet and is sitting on a OXO silicone sink mat.
I'm going to try to find some 1" ID silicone tubing and perhaps shorten the PVC on the return riser by several inches.
Anyone else had this problem? Any advice?
Thanks for looking.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 04:05 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.