Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Reef

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 09-25-2002, 01:03 AM
SuperFudge's Avatar
SuperFudge SuperFudge is offline
Member
 
Join Date: Aug 2001
Location: Chilliwack.B.C.
Posts: 741
SuperFudge is on a distinguished road
Default Ca reactor feed

Quote:
Originally posted by smokinreefer:
hey guys,

so marc,
my return lines are 1"...so you mean "T" it off and reduce it to 1/4" to feed the reactor? i guess i would need a valve on the line as well to control the feed into the reactor too?

TIA
<font size="2" face="Verdana, Helvetica, sans-serif">Well you can tee off and do this,but for 15 bucks you can buy the tap,and just tap into a coupler or fitting you already have inline.
Either will work,but
tapping only takes a few minutes,rather than gluing new fittings and such.
Make sure your not tapping just the pipe wall,it is too thin walled to get a good thread,get a coupler with the pipe already glued in it.

You usually wont need to put a valve in there before the reactor,as you have a valve on your effluent output.
also the ends of the lines to the tank are free flowing,so there is not huge pressures involved.
Itll just pressurize your reactor a little more.

But before you do... you dont have those 1" lines tee`d off anywhere else do you ?...like a skimmer or multiple tank outlets ?
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 02:36 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.