![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
#11
|
||||
|
||||
![]() i see your points but my way of thinking is
module 1 heaters module 2 return and CL pumps module 3 powerheads for wave actions dont run UV, ATO,auto feeds, electronic reactors i see no reason for my dosing pump skimmer, cabinet light to run thru a controller unless it was connected to the internet which in turn to my pho ne..........unless im missing something but that to ne isnt worth the extra few hundred bux i can plug a power bar into an outlet for 2 heaters controlled together powerbar for pumps controlled together my mixing station is nowhere near the tank so they would never get plugged into it i still have an extra module left
__________________
250G DD LED SPS R.I.P. 180G LED SPS 80"x36". 300G custom build Owner of Mountain Ridge Heating and Gas Class A gas fitter, HVAC |
Thread Tools | |
Display Modes | |
|
|