Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Tank Journal

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 02-14-2012, 05:47 AM
gregzz4's Avatar
gregzz4 gregzz4 is offline
On Hiatus
 
Join Date: Oct 2011
Location: Burnaby, B.C.
Posts: 4,890
gregzz4 will become famous soon enough
Default

I finally got some time to start plumbing the tank to the sump. I started with the return line to make sure I wouldn't have to move the tank again and think I'll be happy with it. Of course I hate the 'over-the-back' look, but we don't see the pipes from our seated area.


So I moved on to the drains.
I feel for those of you that have to do ALL of your plumbing inside the cabinet. Man, getting the lines to leave the stand just right is a chore/pain on the ol' bod, nevermind all of you having to deal with a sump in the way and such.




I'm moving along well, taking my time to get everything just the way I want it, and I run out of 90s.
I was hoping to test the overflow bulkheads tonight, and the plumbing running tomorrow. NOT
And to add for all of us who deal with shipping stuff ...
I waited 4 weeks for new Vortech motor bearings. I e-mailed the supplier today and they are re-shipping. Not a set back, but just a typical reefer's shipping woes.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 01:09 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.