Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Tank Journal

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 12-11-2011, 10:40 PM
asylumdown's Avatar
asylumdown asylumdown is offline
Member
 
Join Date: Jan 2010
Location: Calgary
Posts: 1,806
asylumdown is on a distinguished road
Default

Painters are working on the enclosure and the doors for the cabinet are finished.

Mock up pre-paint. The hardware hasn't been installed yet so I just placed the doors in the frames for the pic. The framing panel that will be screwed in after the tank is in is inside on the left:


Inside the tank space is now fully plasticized. The stuff feels almost like rubber. They coated everything, drywall, studs, anything that could be exposed to moisture or humidity.



Back of the doors. This just happened on friday so the coating is still curing. The door on the top left has louvres cut in to it so when the ceiling fan is running, it will draw air from the furthest/lowest point in the cabinet, hopefully keeping moisture in the sump and tank space to a minimum.


If I'm lucky, the tank will be in before Christmas and we can get everything plumbed. Then to cycle! Finally starting to think about scaping options...
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 01:40 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.