Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Reef

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #15  
Old 06-23-2011, 03:25 PM
sphelps's Avatar
sphelps sphelps is offline
Member
 
Join Date: May 2006
Location: Lyalta, East of Calgary
Posts: 4,777
sphelps is on a distinguished road
Default

Quote:
Originally Posted by mike31154 View Post
The way he described his overflows (post #8), the extra, or return holes are drilled outside of them. He'd have modify or move the overflows to include these outside holes (or plug them?) to do the Herbie using all drilled holes.
IC, in this case I would personally wouldn't use a standard herbie design, I think using a second overflow with the purpose of emergency only will lead to problems as already stated such as stagnant water even if it's higher as water will still sit around the bulkhead which could lead to mold growth and that algae smell. What I would do is use the one overflow as a primary to take the majority of the flow, you can still set it up with a gate valve but adjust it so a small amount of flow still goes through the second overflow which would have a durso standpipe. Setup the durso so it has a small siphon break hole and a longer downspout, if the primary clogs up the durso will siphon under the higher load to prevent tank overflow. The second overflow will need to be slightly higher but nothing significant, a layer of silicone should be sufficient.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 04:19 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.