Quote:
Originally Posted by Myka
Sorry to use your pics of what not to do reefwaars, but this is not the best example of framing. The corners are not done properly. There should never be a vertical "seam" that runs uninterrupted. All the nails/screws/bracing in the world won't fix that. A double top plate could fix it though as well as nailing the bottom plate to the floor joists if that hasn't already been done.
FWIW, I'm a carpenter.
|
there will be a 2x6 top plate added to the top and bottom that covers all joins and i still have more framing to do to the top and middle, its not finished yet these are just some pics up untill i ran out of wood. i used screws but am fully aware of the difference in nails to screws as i too am a carpenter and have been framing since i was 15 but now do more general contracting but i do prefer using nails to screws when it comes to support. i used screws for now because i am going to be moving just after christmas so this is just a quick stand to get evereything pieced together untill i can move it into its new resting spot untill then the tank will sit empty on framing and when i get my sump built i may run a freshwater fill but after christmas i will be wanting to take it all apart and rebuild in another house and one i will own lol in which case i will use a bit of both

thanks for the suggestions

