![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
#7
|
||||
|
||||
![]() My pump has 1.5" inlets and outlets all I had drilled in my tank was a 3/4 outlet I want to run the 4 lines over the top of the tank I can run any size pipe required
__________________
250G DD LED SPS R.I.P. 180G LED SPS 80"x36". 300G custom build Owner of Mountain Ridge Heating and Gas Class A gas fitter, HVAC |
Thread Tools | |
Display Modes | |
|
|