its been another busy day, i completed the plumbing of the ro top off and of the water change system. in the picture with the garbage can the plumbing runs up the wall against the 2X4 and to the right of the garbage can on the wall is a switch and outlet i wired in to control the water pump so that i dont have to unplug it all the time with wet hands. water and electricity dont mix too well and thats another reason i moved the switch a couple studs away. the tank water is really clearing up already after installing the filter floss, i put a filter bag over each overflow drain and layer under my coarse sponge baffle area and within 3 hours or so its almost crystal clear.

i installed a couple t's in the flex line for the water change tubing just to make it more tidy and the tubing doesnt bend well without kinking also
