![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
![]() |
|
Thread Tools | Display Modes |
|
#1
|
||||
|
||||
![]() Hi,
I would recommend drilling too. From experience, flooding will happen eventually with overflows - stupid snails!!! I drilled a 1.5 inch bulkhead in my 90g with water in it. I drilled through the back panel - 8 inches from the top and side and its 1/2 inch thick. I had it running for 2 years and it seems to be doing fine. 37G? Probably two 1 inch bulkheads will be fine. How much flow are you gonig to put through those bulkheads? - Victor. |
![]() |
Thread Tools | |
Display Modes | |
|
|