![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
#2
|
|||||
|
|||||
![]() Next I had to build my return pipes; the pump is connected to the pipes with braided PVC hose.
![]() This is the temp set up in the tank until my Loc-Line order arrives. ![]() The sump with the heater and return pump installed. ![]() And final the new piping mess in the back of my cabinet. ![]() Now I just need to add some tap water and do a leak test.. hmm I think I will wait another month or two to do that just to see who cracks first.. Brad, or Mike :D :D Steve |
Thread Tools | |
Display Modes | |
|
|