![]() |
#11
|
|||||
|
|||||
![]() I have sourced some medical tubing here: http://www.new-line.com/hose/tubing/...medical-tubing, hoping this reduces the transfer of vibration to the plumbing.
I'm a little disappointed it's taken me 2 weeks to find the time to get out to Langley to pick it up. Every little hiccup pushes this build behind. It's like 2 steps forward, 1 step back. Ram3500 graciously invited me to see his Kessil A360's in action. I've pretty much decided those are the fixtures I'm going with. Thanks Ian! I have 3 1/2 weeks off from work at Christmas (thank-you baby Jesus). If I can pry myself away from the wifey and I playing Lego Hobbit, I'm sure this build can get finished! Hopefully more updates this week and rock sculpting next weekend. |