#11
|
|||||
|
|||||
![]() Quote:
If you base design conditions on a 1" different between chamber heights, a single 2NPS line will only flow around 1000GPH max. Given the flow rate of each pump, the number of pumps on each side, the fact each run on current switching devices and you plan on adjusting flow rates on each line with gate valves you will need the capability of a larger flow rate than say 1000GPH. Also if one pump is shut off for maintenance or other reasons this number will have to increase further. 1" design difference may also be too extreme as well when you consider how your ATO will work. Ultimately 3-4 2NPS connection pipes may be needed, whether there is room for this or not is the question. Since you're against gaps under baffles the best solution may be removing the baffles and trimming the width, then adding another baffle that connects the chambers of each side. Pic for ref: ![]() Last edited by sphelps; 08-12-2013 at 05:41 PM. |