![]() |
#11
|
|||||
|
|||||
![]() Frame 100% done and now for paint. Primer is done.
![]() Here is how I plan to attach panels. I drilled holes on the top frame and will use a peg/magnet system. The top of the removable panel will have pegs to drop into the holes... The bottom will have "Rare Earth" magnets to hold it closed. Can anyone help me out with some thoughts or opinions? ![]()
__________________
![]() My 70 Gallon build: http://www.canreef.com/vbulletin/showthread.php?t=66478 My Mandarin Paradise: http://www.canreef.com/vbulletin/showthread.php?t=72762 I wonder... does anyone care enough to read signatures if you make them really small? I would not. I would probably moan and complain, read three words and swear once or twice. But since you made it this far, please rate my builds. ![]() |