![]() |
#10
|
||||
|
||||
![]() so got my brs order friday and the went to rona today to get some fittings
![]() gate valves, true union ball valves, and check valve + fitings ![]() the grizz stoped by and i got two tlf 150 reactors off him. so heres my starting point off my return pump ![]() i then made this header to come off it. i teed off and reduced to 1/2 inch with gate valves to feed the reactors and installed a 1" check valve to {hopefully} stop anywater from coming back into my sump in a power outage. ![]() heres my return bulkheads that i have to pipe too im going to put gate valves on each line to control the flow on each. ![]() i forgot a few fittings today so hopefully get them tomorow to finninsh up. |