![]() |
#2
|
|||||
|
|||||
![]() You pretty much have it spelled out, I'm not sure what you mean by "Lots of wires to connect multiple pumps and controller" for tunzes. As far as I know each vortech requires it's own controller but each controller can communicate with each other without an interconnect cable while tunzes just all plug into one controller. If anything I think you'll have more wires and stuff with the vortechs.
Lots of threads like this already but I run Tunze, I have two 6105s and two 6100s. I run the tunzes purely because they are quite, MP40s would be louder than any other piece of equipment I have. |