Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Product Review and Equipment Forum > Controller and Monitoring Specific

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 04-09-2012, 04:58 AM
Madmak's Avatar
Madmak Madmak is offline
Member
 
Join Date: Feb 2012
Location: Chestermere, AB
Posts: 432
Madmak is on a distinguished road
Default Apex Controller Advice

I'm working on setting up my new Apex unit and am curious about a few things like:

One outlet per heater or one outlet for all?

15A circuit for each Energy Bar?

Separate outlets for each reactor and skimmer?

Any other hints?

I have 2 Energy Bar 8s for under the DT and 1 Energy Bar 4 for my mixing area. I need to find a 50 foot USB cable for between these areas.

The EB4 will power a Mag 12 pump for mixing/transferring, a heater, and a Vertek 100 GPD RO/DI unit. I'm hoping to add a temp probe and salinity probe here later.

The 2 EB8s should be enough to run everything under the DT and lights. A pH probe, temp probe, and conductivity probe will be in the sump.

I will wire up my own cable as a breakout box.

Let me know what ideas you might have on switching things up.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 06:50 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.