![]() |
#29
|
|||||
|
|||||
![]() Heatsink is in, went with a solid piece 6 feet long
For the LEDs I decided im going to use myself as a genuine pig for a new board design we are working on. I should have the new board within the next two months. Once I have the LEDs on the new board, it will literally be a 30min install process. I will be going with the new XM-Ls NW/CW and XP-E RB. |