Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > DIY

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 03-08-2011, 05:59 AM
ensquire's Avatar
ensquire ensquire is offline
Member
 
Join Date: Sep 2010
Location: Yellowknife
Posts: 669
ensquire is on a distinguished road
Default Minimum Clearances when drilling an overflow

My overflow has 2 holes right now and I'm gonna do a Herbie, but space is tight. It currently has a main drain thru a 1" bulkead and a 1/2 bulkhead for the emergency overflow. I tested it running a Quiet one 4000 for the return at about 4' of rise to the head. ran return wide open and had to throttle down drain to maintain siphon. stopped main drain and it wasn't a big enough emergency line.
My options are a 3/4" or a 1' bulkhead . 3/4 might handle it but would be even safer at 1'.
Which bring me to this question. If I drill a 1 3/4" hole in the space available for the 1" bulkead there will only be a little over an inch between the two holes. and only slightly more for the 3/4. IS THIS ENOUGH????
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 11:31 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.