Quote:
Originally Posted by abcha0s
Once the sand goes in, the whole peg system becomes fixed. I figure I will have to vacuum out the holes as I am working with the rock to get rid of any lose particles that break off. In any event, I will take the time necessary to get it right the first time.
|
With that in mind though, you might only have a few pegs drilled into even the largest of your rocks. You seem to have enough pegs drilled in that, even with only a few minutes of substrate vacuuming (depending on the depth of your sand bed), you should have enough sand off to adjust your rocks. It might not be as tedious as suggested, but we'll have to see.
Looking forward to the rest of the updates!