![]() |
#16
|
||||
|
||||
![]() Electrical supply from mains board, it helps having a brother who can frame as well as being an electrical contractor!!!!!!
[IMG] ![]() The top up and water change will be carried out in the mechanical room with an RO unit plumbed into the mains supply, a bit more framing and the tanks were installed. ![]() The display tank in the wall and the top up system are connected by a pipe in which all of the plumbing runs, it can be seen to the right and top of the frame holding the top up tanks: [IMG] ![]() |