![]() |
#11
|
|||||
|
|||||
![]() BC Ferries ruined my reef meeting today, but the day wasn't all lost. Got some more progress on the fishroom!
Ok so we got the teleposts up to support the ceiling while we ripped out the guts of the load bearing wall. (my husband loves making faces for the camera) ![]() Backside of the wall (the actual fish room) ![]() Matt had a good ole time with the sledgehammer ![]() ![]() Open sesame! ![]() Shoring up the studs (the 2x6 part ![]() ![]() Getting the header in (the 2x10 part ![]() ![]() Tada!!! And the ceiling didn't even fall in! ![]() ![]()
__________________
Christy's Reef Blog My 180 Build Every electronic component is shipped with smoke stored deep inside.... only a real genius can find a way to set it free. |