![]() |
#7
|
|||||
|
|||||
![]() So a logical progression would be:
1. Tap water test tanks and pumps. 2. Drain and refill with RO 3. Heat and salt water to taste (About 50g) 4. Move over eqipment and lighting leaving a powerhead and heater running in Old tank 5. Move over about 25g of water 6. Move over Liverock 7. Move over 25g of water 8. Move over rest of livestock 9. Move over rest of water 10. Top up water so tank is full 11. Move over rest of equipment 12. Enjoy a beer Sound about right? Am I missing anything?
__________________
My Tank: 135G display, 45G Sump, 20G top off. 2 x 400 W, Bullet 1.5, Snapper Return, Profilux. ------------------------------------------------------------------------------------------------------ My Photo Website |