![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
#4
|
||||
|
||||
![]() I am pretty sure my floor joists are engineered floor joists because it looks like this http://www.icreatables.com/framing/w...or-joists.html
I double check in the basement, there is at least 1 joist below the tank. the tank is positioned from half the distance from load-bearing wall - 1st joist to half the distance from 1st joist to 2nd joist. So the first joist takes all the hit. |
Thread Tools | |
Display Modes | |
|
|