![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
#3
|
|||||
|
|||||
![]() Sure thing, it's simply another conventional cartridge holder with a DI cartridge in it. Plumb in after RO membrane with tubing & JG fittings. Most system vendors offer the extra stage including a bracket to mount it alongside your current RO setup. I added a tee with separate shutoff valves so I can tap in before DI stage for drinking water.
__________________
Mike 77g sumpless SW DIY 10 watt multi-chip LED build ![]() |
Thread Tools | |
Display Modes | |
|
|