![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
#11
|
||||
|
||||
![]() [quote=medhatreefguy;519275]Plumbing is as complete as I can get it for now. Simple Herbie overflow and inlet through two 3/4" bulkheads with Loc Line. Hopefully tomorrow I can start the big move.
![]() The emergency and the( overflow with the gate-valve) need to drain separately. You will get a loud gurgling sound. Kevin |
Thread Tools | |
Display Modes | |
|
|