Canreef Aquatics Bulletin Board  

Go Back   Canreef Aquatics Bulletin Board > General > Reef

Reply
 
Thread Tools Display Modes
  #21  
Old 06-30-2011, 06:23 PM
parkinsn's Avatar
parkinsn parkinsn is offline
Member
 
Join Date: Oct 2007
Location: Calgary
Posts: 710
parkinsn is on a distinguished road
Default

Quote:
Originally Posted by wickedfrags.com View Post
There is always a way. Electricians have some outstanding tools for this
Such as this one.

http://www.licensedelectrician.com/S...ire_Python.htm
Reply With Quote
  #22  
Old 06-30-2011, 06:32 PM
sphelps's Avatar
sphelps sphelps is offline
Member
 
Join Date: May 2006
Location: Lyalta, East of Calgary
Posts: 4,777
sphelps is on a distinguished road
Default

You can also change a standard single pole breaker to a double pole if the box is full.

Reply With Quote
  #23  
Old 06-30-2011, 07:10 PM
parkinsn's Avatar
parkinsn parkinsn is offline
Member
 
Join Date: Oct 2007
Location: Calgary
Posts: 710
parkinsn is on a distinguished road
Default

Also if your going to pull a new circuit pull a 20amp, so you can have more juice on it. The cost of the wire and breaker to upsize is minimal.

The above breaker will come in a 15amp-20amp combo if that is the route you go.
Reply With Quote
  #24  
Old 06-30-2011, 07:43 PM
sphelps's Avatar
sphelps sphelps is offline
Member
 
Join Date: May 2006
Location: Lyalta, East of Calgary
Posts: 4,777
sphelps is on a distinguished road
Default

Quote:
Originally Posted by parkinsn View Post
Also if your going to pull a new circuit pull a 20amp, so you can have more juice on it. The cost of the wire and breaker to upsize is minimal.

The above breaker will come in a 15amp-20amp combo if that is the route you go.
^ Another good tip!
Be sure to also install a 20 amp receptacle (or two/however many) and if this is a permanent job and you plan on doing it yourself I would advise you also pull a permit and get it inspected. Even though it's an easy job and the inspection is rather redundant it may serve you well later if you ever sell your house as any home inspector will question the existence of a 20amp receptacle in a basement and advise the potential buyers to trace back for permits.
Reply With Quote
  #25  
Old 06-30-2011, 08:03 PM
mike31154's Avatar
mike31154 mike31154 is offline
Member
 
Join Date: Jul 2008
Location: Vernon
Posts: 2,073
mike31154 will become famous soon enough
Default

Quote:
Originally Posted by MarkoD View Post
discription of light says "Oceanballast M magnetic ballast"

and extension cord isnt an option. i dont want cords running to my tank.... i like the fact that everything is clean and hidden.

what im gonna try and do is move the room lights to another circuit (it'll take 6 halogen bulbs off the load)
Facing the option of whether I can deal with the look of an extension cord(s) or risk burning my house down, I'd choose the extension cord(s)... as an interim measure. Then I'd get another circuit added, even if it means replacing the entire breaker panel with a new one and/or opening walls if necessary.

Tripping the breaker is a warning shot across the bow (pardon the navy jargon from an air force guy). That circuit with 4x250 watt (1000 watts right there) including whatever else is on it (more lights or perhaps even other devices, good idea to confirm) will be heating up the wiring a fair bit even if it doesn't trip the breaker. A 15 amp circuit will handle about 1800 watts max, 1500 watts reasonably safely. Why risk running a circuit near it's max? It's a safety hazard, no time to be worrying about how a heavy duty extension cord will look. If you wish to run a big tank with plenty of power requirements, you need to ensure you have the necessary circuitry in place.
__________________
Mike
77g sumpless SW
DIY 10 watt multi-chip LED build http://www.canreef.com/vbulletin/showthread.php?t=82206
Reply With Quote
  #26  
Old 06-30-2011, 08:20 PM
MarkoD's Avatar
MarkoD MarkoD is offline
Member
 
Join Date: Dec 2010
Location: Edmonton Alberta
Posts: 1,904
MarkoD is on a distinguished road
Default

thanks for your input guys.

heres the solultion i went with.

having my T5s on from 330- 10

and having my halides turn on in sequensial order starting at 4 (when i get home from work)

so at any given point there is only 2 metal halides on at a time.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 11:33 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.