![]() |
#1
|
||||
|
||||
![]() Finally my new build is underway
![]() ![]() Got a great stand built by The Grizz in Blackfalds. Right now I just sheeted it in 3/4 ply ![]() Tank is 60 x 30 x 24 ![]() ![]() Coming out either side of the overflow I have my returns plumbed into locline with water flow accelerators. ![]() Inside the over flow I decided to use some flex pipe to plumb the returns without using elbows for max flow. You can also see the standpipes here. It will be a herbie overflow. I used threaded bulkheads so the standpipes can be removed and modified easy for some tuning. Going to see how it runs first without a top cap on the secondary pipe. Currently I have the main over flow about 2 inches below the secondary. Not really sure how much lower it needs to be however I can always remove them and adjust later. ![]() Primary over flow is attached to a gatevalve . ![]() Overflow plumbing is 1 1/2 and the return is 1 inch from the pump reduced to 3/4 after split for the 2 returns. I plan on splitting my overflow 1/2 going to a fuge tank then to the sump and half going to a water changer tank then to the sump. I can by pass the flow from the water changer, drain and refill for easy water changes. More on that later. Thats it for now ![]()
__________________
Western Database - Custom database, software design and cloud hosting. |